
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>The four drawings required for licensure.</title>
<link>https://www.samsog.org/forums/posts.aspx?topic=1845229</link>
<description></description>
<lastBuildDate>Fri, 17 Jul 2026 05:34:41 GMT</lastBuildDate>
<pubDate>Mon, 16 Feb 2026 12:50:12 GMT</pubDate>
<copyright>Copyright &#xA9; 2026 Surveying and Mapping Society of Georgia</copyright>
<atom:link href="https://www.samsog.org/forums/topic_rss.asp?id=1845229" rel="self" type="application/rss+xml"></atom:link>
<item>
<title>The four drawings required for licensure.</title>
<link>https://www.samsog.org/forums/posts.aspx?topic=1845229</link>
<guid>https://www.samsog.org/forums/posts.aspx?topic=1845229</guid>
<description><![CDATA[<p>The Board Rule 180-2-.01(3) states "...applicants for licensure as a Professional Land Survey in the State of Ga must submit two boundary drawings and two topographic survey drawings..."</p><p>&nbsp;</p><p>My question is, if the individual works on an ALTA survey that includes Table A Item 5, would the applicant get credit for 1 boundary and 1 topographic survey with that one project?</p>]]></description>
<pubDate>Mon, 16 Feb 2026 13:47:38 GMT</pubDate>
</item>
<item>
<title></title>
<link>https://www.samsog.org/forums/posts.aspx?topic=1845230</link>
<guid>https://www.samsog.org/forums/posts.aspx?topic=1845230</guid>
<description><![CDATA[As a board member, I suggest you submit two boundary surveys and two topographic surveys, as the law dictates.    You could use the same drawing with different data depicted, but you should submit a four separate drawings.]]></description>
<pubDate>Mon, 16 Feb 2026 13:50:12 GMT</pubDate>
</item>
</channel>
</rss>
